The Wang's untouched acre lot in South Surrey, BC. |
 |
Construction of the Wang's home begins in the Kodiak Log Homes log yard in 100 Mile House, BC |
 |
Back at the building site, the excavation begins on November 19th at 1:28 PM |
| 4 Rounds up on the main house and 8 rounds up on the utility building. At the 8 foot level, the walls of the utility building are almost complete. The window openings are cut at this point and the headers are on. |
 |
The excavation is now completed, and the footings are put in place. |
 |
The Wang's log shells are virtually complete in pur log home construction yard, with only the electrical pockets and custom handrails remaining to be completed. |
 |
Meanwhile, back at the site, the footings are now in place and the forms for the foundation walls are on the way. |
 |
Following the completion of the log shells at our log yard, Mr. Wang and Mr. Beugelink (rep of the general contractor), visually inspect the shell prior to delivery. |
 |
The forms for the foundation are set-up, the foundation poured, forms remodev, and the foundation is sealed. |
 |
The framing of the basement walls, main floor joists, and subfloor begins. |
 |
Setup day finally arrives!!!! |
 |
Following the setup of the log shell, the framing crew set to work on the basement and main floor interior walls. |
 |
Framing of the second floor follows closely on the heals of the first floor framing. |
 |
The plumbing is started on the main floor and basement areas while the framing of the second floor is underway. |
 |
The electrical is also started at this time, with the main panel being serviced first. |
 |
Setting the trusses and puting on the roofing materials is the next step in the completion of the Wang's log home. |